
Some considerations before sampling: Syringe should be filled to 80% full. Refer to ASTM D3613 for complete instructions on the sampling of transformer insulating fluids. |
![]() | ![]()
|
That's it. You should now have a representative sample of the oil from within the transformer ready to be shipped to the laboratory.
Complete the information on the sample data sheet and prepare the sample for shipment. Be sure to write down all pertinent information on the sample data sheet.